Introduction to 3D T&A
© 2022, ASCENT - Center for Technical Knowledge® 1–31
3. Enter a new value of 2.6 and click OK.
4. Click (Exit App) to exit Sketcher. The system updates all
geometry and annotations based on the design change, as
shown in Figure 1–30.
Figure 1–30
Task 5 - Activate a view and add a note.
The frame of the currently selected view highlights in cyan on the
model and in the specification tree. Any annotations created are
automatically associated with the activated view, which displays
as red in the model and dark blue in the specification tree.
In this task, you add a text annotation to the model to
demonstrate the properties of the active view.
1. Expand the Annotation Set.1>Views branch of the
specification tree. The active view, Front View.2, is indicated
by a red plane in the specification tree and on the model.
2. Double-click on Front View.1 in the specification tree to
activate the view.
3. Click (Text) from the Annotation section of the Action
Bar and select a location close to the one shown in
Figure 1–31. The Text Editor dialog box opens.
Figure 1–31
LinerSize.1 dimension
updates with a design change.
Select here.
Sample
provided
by
ASCENT
for
review
only
All
copying
and
reuse
strictly
forbidden.